Case 3 Patient arrived with CC of coronal fracture. Tooth previously treated and deemed restorable.Initial pour of maxillary teethPatient advised of esthetic concerns in anterior region and initially desired to both close natural diastema and crown #8 and #9. Tooth #9 was prepared and cast post was fabricated. Imaged above was on the day of post cementation. Stump shade was taken to aid color match.Shades and pictures were sent to laboratory to assist shade matching.Intraoral scan was taken using the Trios software, and margins marked prior to sending to the lab.Patient later chose to maintain natural diastema. Patient was comfortable without perfect shade match and aware that adjacent and contralateral teeth all were of different shades. Patient will be continuing treatment to replace current RPDs with implant-supported prosthesis.